OFFLINE FORM
      Download our offline form. You can print it and fill at your home. Then give it to us when dropping off the raft.
      OFFLINE FORM
      APPROVALS
      Vancouver Liferaft & Safety is approved by Transport Canada.
            
            HOW DO WE SERVICE?
      Documentation of the service:
- Liferaft is received and registered
- Logbook in the liferaft is completed (proof that the liferaft has been opened and tested)
- Inspection is performed using the VIKING approved inspection checklist
- Certificate of re-inspection is issued
- Full documentation for service is archived according to regulations
- Detailed invoice is issued
            
        
                    - Container is opened and the inflation system dismounted
 
                    - Liferaft is removed from the container
 
                    - Container shell is cleaned and fibre glass is repaired if needed
 
                    - Container is relabelled
 
                    - Life raft is inspected inside and out
 
                    - Liferaft is inflated with compressed air and pressure tested including a 60 min. working pressure test of the lower buoyancy chamber, upper buoyancy chamber and arch chamber
 
                    - If the life raft is equipped with an inflatable floor, this is pressure tested for 60 min.
 
                    - Gas inflation stress test (GI) is conducted every 5 years using the liferaft’s own CO2 cylinder to inflate the liferaft
 
                    - Necessary additional pressure test (NAP) at double the working pressure rate is conducted at 11 years end then annually thereafter
 
                    - Floor seam test (FS) is performed to check the seams of the internal floor and is conducted at 10 years and then annually  
 
                    - Emergency pack in checked and items replaced if expired according to regulations
 
                    - Life raft equipment is inspected and replaced if needed
 
                    - Cylinder operating head, valve, knife and release wire is inspected
 
                    - Inflations systems and high pressure hoses are inspected
 
                    - CO2 cylinder is checked for correct content level
 
                    - Life raft is deflated, repacked in the container and prepared for dispatch